Electricity Purchase from Small and Medium Scale Renewable Energy and Excess Power (No. 4/2012) Indonesia 2012

Name of policy Electricity Purchase from Small and Medium Scale Renewable Energy and Excess Power (No. 4/2012)
Jurisdiction Country
Supranational region
Country Indonesia
Region Asia


Subnational region or state
City or local
Policy objective
  • Mitigation
Type of policy instrument
  • Economic Instruments
    • Fiscal or financial incentives
      • Feed-in tariffs or premiums
Sector name
  • Electricity and heat
    • Renewables
Policy description "Ministerial Regulation No 04/2012 on Electricity Purchase from Small and Medium Scale Renewable Energy and Excess Power introduces new differentiated feed-in tariff levels in Indonesia. Tariff levels are differentiated depending on the installation type, its location and voltage of grid interconnection. Following technologies benefit from the scheme: Biomass, biogas, municipal waste and hydropower plants below generation capacity of 10 MW." (IEA policy database, see link below)
Policy type
  • Renewables1
Policy stringency
Implementation state Superseded
Date of decision 2012
Start date of implementation
End date of implementation
High impact
Impact indicator


Source or references http://prokum.esdm.go.id/permen/2012/Permen%20ESDM%2004%202012.pdf

http://www.iea.org/policiesandmeasures/pams/indonesia/name-43000-en.php http://cdkn.org/wp-content/uploads/2015/04/ECN-Policy-Brief-Indonesian-Feed-in-tariff-140304.pdf

Supports policies
Is supported by policies
Comments (background and assessment)
Status Final

Download this policy as Excel file