The renewable energy decisions linked to this plan are: directing the US Department of the Interior to permit 10 gigawatts (GW) of renewables on public lands by 2020; setting a goal to install 100 megawatts of renewables in federally assisted housing by 2020; and deploying 3 GW of renewables in military installations; The Administration set a goal to double renewable electricity generation (wind, solar, and geothermal) by 2020.
Target
- Double renewable electricity production between 2011 and 2020