Phase 1: 70 MW of RE (50 MW CSP, 10 MW PV and10 MW Wind). The ultimate goal of Phase 1 is to collect technical and economical performance data and information and carry out R&D activities. This phase is an on-going activity and is expected to be operational by early 2016.
Phase 2: Extending the plant to reach 1000 MW (550 MW CSP, 380 MW PV, 70 MW Wind) and it is expected to be operational by 2020.
Phase 3: Final extension of the plant to reach a total of 2000 MW (1150 MW CSP, 723 MW PV, 127 MW wind) and it is expected to be operational by 2030. IEA/IRENA Global Renewable Energy Policies and Measures Database © OECD/IEA and IRENA, [November 2020]