Bulk procurement programme where farmers are to be provided with star-rated pumps with VFD/Controller, and financing and installation, as well as free repair and maintenance for the contract period. The aim is to make it possible for farmers to receive revenue on a monthly basis by selling the excess power to the grid for a period of 25 years. IEA/IRENA Global Renewable Energy Policies and Measures Database © OECD/IEA and IRENA, [November 2020]