The plan contemplates a reference scenario building up on the previous Generation and Transmission Expansion Plan (2015-2029). This scenario estimates 1427 MW hydroelectric generation (including 1200 MW from Ituango project), approximately 1456 MW from wind energy projects and 569.2 MW for geothermal, biomass and distributed solar PV generation projects. IEA/IRENA Global Renewable Energy Policies and Measures Database © OECD/IEA and IRENA, [November 2020]