The GTP II (2016-2020) supersedes the GTP I (2011-2015) (see here: http://climatepolicydatabase.org/index.php/The_Growth_and_Transformation_Plan_(GTP)_Ethiopia_2010)
GTP II is a comprehensive strategy to improve economic condition of Ethiopia and includes energy and renewable energy targets guiding country’s development. (source: IEA)
The renewable energy capacity targets for 2019/2020 are as follows:
Hydropower: 13,817 (MW)
Wind: 1,224 (MW)
Solar PV: 300 (MW)
Geothermal: 557 (MW)
Reserve fuel (gas turbine): 509 (MW)
Waste-to-energy: 50 (MW)
Sugar: 474 (MW)
Biomass: 257 (MW)
GTP II aims to bring the level of electrification to 90% of the population by 2020 (against 60% in 2014/2015). IEA/IRENA Global Renewable Energy Policies and Measures Database © OECD/IEA and IRENA, [November 2020]