The Integrated Wind Energy Program aims to increase the capacity of national wind farms from 797 MW in 2015 to 2,000 MW by 2020.
"The Integrated Wind Energy Program includes the construction of three wind farms (Tanger II, Midelt and Jbel al Hadid) with an installed capacity of 450 megawatts structured through public-private partnerships.
The objective is to boost electricity production whilst protecting the environment and offering clean energy to the local population. The programme will also help to cover growing electricity needs and ultimately create jobs, develop high level expertise and boost research and development in the area of wind power, which offers considerable potential for Morocco in the future. It is in line with the strategic guidelines of the NIF and the Mediterranean Solar Plan, which aim to contribute to creating conditions for sustainable economic growth whilst respecting the environment."
(source: https://ec.europa.eu/europeaid/blending/integrated-wind-energy-programme_en)