The country’s generation and transmission system planning is based on a 20 year rolling Least Cost Power Development Plan (LCPDP), last updated in June 2018 (2017 – 2037 LCPDP). The 2017 – 2037 LCPDP recommended inter alia the renegotiation of power purchase agreements for large power plants to introduce operational flexibility and optimize energy costs.