The aim of this Act is to promote the development of offshore wind power, with the aim to increase the installed capacity to a total of 15 GW between 2021 and 2030. The level of funding is to be determined by means of competitive auctions. IEA/IRENA Global Renewable Energy Policies and Measures Database © OECD/IEA and IRENA, [November 2020]