Under the plan, priority is given to the installation of power lines coming from renewable energy facilities and for combined cycle power plants; and also for the building of natural gas pipelines to serve co-generation and combined cycle plants. The structure of electrical generation is to be modified through fuel substitution and technical change. The plan is to increase the installed capacity of wind power facilities to 13 000 MW in 2011 and of combined cycle plants to at least 14 800 MW by 2011. The forecast for energy demand used in this new plan is higher than that used in the Renewable Energy Plan. In order to reach the target of 12% of energy produced by renewables, the plan updates the objectives for wind energy and biomass electricity production in the 2000 Renewable Energy Plan. IEA/IRENA Global Renewable Energy Policies and Measures Database © OECD/IEA and IRENA, [November 2020]